ISO 9001CECNAS TestedBV InspectedAsbestos-Free (AU)
Exporting since 2020 · 100+ countries +86 158 8041 2886
JIUJIAN GLOBAL

Quality Control: Every Check Between Steel and Shipment

ISO 9001 process control, CE marking, CNAS and BV inspection

Incoming material

Steel, panels, insulation and fittings are checked against the order specification on arrival, and non-conforming material is rejected before production.

In-process checks

Frame dimensions, panel joints, glazing seals and electrical routing are inspected at each stage, with photo records kept for the buyer.

Final inspection

Before loading, every module is powered up, water-tested and dimension-checked, and the packing list is verified module by module.

Third-party inspection

Buyers can appoint SGS, BV, Intertek or another inspection company. We arrange access, sample units and documentation for the inspection.

Need a quotation for your project?

Send your layout and destination port. We reply with price, specification sheet and container loading plan within one working day.