20FT Flat Pack Container House
Standard 20FT flat pack module: folded for transport, assembled with four bolts per corner on site.
View specifications →
Container houses, double wing expandable units, apple cabins and space capsule houses — welded, insulated, wired and fitted out in our own workshop, then loaded for your destination port.
Every range is built in the same workshop and follows the same inspection process, so a mixed order — dormitories plus a sales suite plus resort cabins — ships together.
Standard 20FT flat pack module: folded for transport, assembled with four bolts per corner on site.
View specifications →
A 20ft folding module for volume orders: delivered folded, unfolded on site with a forklift, ready for beds or offices in under an hour.
View specifications →
Both long side walls unfold to double the floor area; metal carved panel facade and complete interior.
View specifications →
A 20ft module that opens on site into a 35 m² studio or one-bedroom unit — finished interior, one day to commission, one container slot to ship.
View specifications →Prefab housing fails on the details: the wrong electrical standard, a layout that will not fit the container, a module that cannot be lifted on site. We close those gaps before production starts.
Layout, electrical standard and loading plan are confirmed with your signature before the first steel profile is cut.
Bathrooms, kitchenettes, flooring and electrics are installed and tested under our roof, so site work is limited to lifting and connections.
Welding, panelling, fit-out, testing and container loading are photographed for your file before shipment.
SGS, BV, Intertek or your own QC team can inspect in our workshop — we arrange access, samples and documentation.
Dormitories, offices, canteens and sanitary units for remote construction and mining camps.
Stacked container dormitories with steel walkways, sized to the number of workers on site.
Capsule and apple cabin units for resorts, glamping sites and landscape projects.
Double wing expandable units used as site offices, sales suites and temporary showrooms.
Modular dormitories, ablution blocks, mess halls and site offices for mine sites that start small and expand as the ore body is proven.
Accommodation, welfare and office modules for oil and gas field operations, specified for harsh climates and fast mobilisation.
Short-term and relocatable accommodation for events, seasonal workforces, relief operations and projects that need rooms within weeks.
Since 2020 our units have shipped to buyers in North America, Europe, the Middle East, Latin America and Asia-Pacific. The list below covers the markets we ship to most often.
Not on the list? We quote to any port — send the destination and we will confirm freight options.
One unit is enough for a sample order. For export efficiency most buyers order a full container load, and we will advise the loading quantity for the model you choose.
Production lead time is confirmed on the proforma invoice and depends on configuration and the current queue. Shipments normally leave from Qingdao port, a few hours from our factory.
Yes. Wiring, sockets, breakers and voltage are produced to the destination standard (US 110V, EU 220V, AU, UK) and tested before loading.
Yes — layout, facade, colour, glazing and branding can all be specified. Send your drawings or describe the application and we return a layout proposal with the quotation.
Send the layout and destination port — we reply with a quotation, a specification sheet and a container loading plan.
Camp design starts with headcount and duration, not with unit prices. Those two answers eliminate most of the options before you request a quotation.
Read →Banks pay against documents, not against goods. A one-word mismatch between invoice and bill of lading can cost a month and a fee.
Read →The clauses that cause disputes are rarely about price. They are about what counts as complete, what tolerance is acceptable and who pays when a date slips.
Read →Send your layout and destination port. We reply with price, specification sheet and container loading plan within one working day.