How are flat pack container houses installed?

Need this answered for your project? Send the site location and quantity — you get a written answer and a quotation.
Short answer

Flat pack container houses are installed in a sequence from foundation to handover: site preparation and foundation, delivery and lifting of modules, panel locking, MEP connection, and final inspection. A typical crew of 4-6 workers using basic hand tools and a crane or telehandler can complete one unit in 6-10 hours, depending on site conditions and module size.

Standards & references

  • ISO 668 — Series 1 freight containers: classification, dimensions and ratings (the dimensional basis for 20FT / 40FT modules).
  • ISO 1496-1 — Series 1 freight containers: specification and testing, used as the reference for corner castings and lifting points.
  • ISO 9001 — quality management system; inspection records and test reports are issued per order.
  • IEC 60364 — low-voltage electrical installations, applied to the cabin wiring layout supplied with each unit.
  • EN 1090-1 — execution of steel structures; can be specified when the destination market requires a declared execution class.

Photographs and video are JIUJIAN GLOBAL factory material. Third-party photographs used elsewhere on this site are credited with author, licence and source on the image credits page. Values marked "to be confirmed" depend on destination climate, local code or final layout and are fixed on the production drawing before deposit.

Need a quotation for your project?

Send your layout and destination port. We reply with price, specification sheet and container loading plan within one working day.