How early should I arrange a PVoC inspection for Kenya?
Before loading: the inspection and certificate of conformity are issued in the exporting country, and destination inspection costs more and takes longer.
Before loading: the inspection and certificate of conformity are issued in the exporting country, and destination inspection costs more and takes longer.
Standard 20FT flat pack module: folded for transport, assembled with four bolts per corner on site.
A 40ft flat pack module that ships knocked down and gives a 29 m² open floor plate — the standard choice for canteens, recreation rooms and open-plan site offices.
A 20ft module that opens on site into a 35 m² studio or one-bedroom unit — finished interior, one day to commission, one container slot to ship.
Photographs and video are JIUJIAN GLOBAL factory material. Third-party photographs used elsewhere on this site are credited with author, licence and source on the image credits page. Values marked "to be confirmed" depend on destination climate, local code or final layout and are fixed on the production drawing before deposit.
Modular dormitories, ablution blocks, mess halls and site offices for mine sites that start small and expand as the ore body is proven.
See the project setup →Accommodation, welfare and office modules for oil and gas field operations, specified for harsh climates and fast mobilisation.
See the project setup →Send your layout and destination port. We reply with price, specification sheet and container loading plan within one working day.