How long does it take to manufacture and ship container houses?

Need this answered for your project? Send the site location and quantity — you get a written answer and a quotation.
Short answer

Production of container houses typically takes 20–35 days for standard flat-pack units, with larger or customised orders extending to 45–60 days. Shipping adds 20–40 days depending on route. Plan a total of 8–12 weeks from deposit to site delivery, including inspection and buffer time.

Standards & references

  • ISO 668 — Series 1 freight containers: classification, dimensions and ratings (the dimensional basis for 20FT / 40FT modules).
  • ISO 1496-1 — Series 1 freight containers: specification and testing, used as the reference for corner castings and lifting points.
  • ISO 9001 — quality management system; inspection records and test reports are issued per order.
  • IEC 60364 — low-voltage electrical installations, applied to the cabin wiring layout supplied with each unit.
  • EN 1090-1 — execution of steel structures; can be specified when the destination market requires a declared execution class.

Photographs and video are JIUJIAN GLOBAL factory material. Third-party photographs used elsewhere on this site are credited with author, licence and source on the image credits page. Values marked "to be confirmed" depend on destination climate, local code or final layout and are fixed on the production drawing before deposit.

Need a quotation for your project?

Send your layout and destination port. We reply with price, specification sheet and container loading plan within one working day.