File a claim with the unit number, delivery date, a dated photograph, a description of the failure and the serial or batch of the affected component; the supplier should acknowledge within days, propose a remedy (repair, replacement part or credit) and record the root cause. Claims without unit-level evidence usually stall.
A warranty is only as good as the process behind it. This page describes the process from the buyer's side — what to record when a fault appears, what to send, and what a reasonable remedy looks like — so a legitimate claim does not get lost in a long email thread.
What to send in the first message
- Unit identification: unit number from the packing list, and the container number it arrived in
- Delivery and installation dates
- Dated photographs — a wide shot locating the fault and a close-up of the fault itself, with something for scale
- Description of the failure: what is happening, when it started, whether it is progressing
- Site conditions: temperature, weather, whether the unit is occupied, water and power supply
- What has already been tried, if anything
How failures are usually classified
| Category | Typical examples | Normal remedy |
|---|---|---|
| Manufacturing defect | Panel delamination, weld failure, mis-drilled frame, faulty wiring termination | Replacement component or on-site repair, at supplier cost |
| Transit damage | Dented panels, broken glazing, bent trim | Insurance claim against the carrier, with supplier support on evidence |
| Installation error | Leaks at joints, doors out of square, unsealed penetrations | Guidance and parts; labour normally at buyer cost |
| Wear or misuse | Overloading, unauthorised modification, corrosion from unvented wet areas | Not covered; parts available at cost |
Where the argument starts
Water ingress is the most common dispute, and it is almost always about the joint, not the panel. Rain entering at a wall-roof junction, a window frame or a sealed penetration is an installation or sealing issue; a panel that has failed internally is a manufacturing issue. Photographs taken during a rain event, showing the water path from entry to drip, settle most of these cases in one exchange.
Time limits and what they should cover
Warranty periods in this trade are typically split: structure and frame longer, panels and coatings shorter, electrical and sanitary components often on the component maker's own warranty. Ask three questions before ordering:
- What is covered, item by item?
- From what date does it run — shipment, arrival, or commissioning?
- Who pays labour and who pays freight for a replacement part?
A warranty that covers the part but not the freight to a remote camp can cost the buyer more than the part is worth. That is worth negotiating before the order rather than after.
Records that make future claims easy
Keep the packing list, the test reports, the loading photographs and the commissioning record together in one file per project. Two years later, when a panel needs replacing, the batch number on the packing list is what allows the supplier to check whether it was a known material lot. Buyers who keep this file get faster resolutions; buyers who do not get a conversation about what might have happened.
Escalation that works
If a claim stalls, escalate on facts rather than volume: a one-page summary with photographs, dates and the remedy requested, sent to the person who signed the contract. Third-party inspection reports carry weight at this stage. Beyond that, the leverage in the contract — retention, spare parts held, or the balance of a staged payment — matters more than any email.
Need this priced for your project?
Send the unit type, quantity, destination port and any layout drawing. We reply with a specification-matched quotation and lead time, usually within one working day.
Request a quotation WhatsApp our team
Related: all container house products · custom container house · contact
Next step: get a real quotation
Tell us the destination port and the quantity, and we send a priced offer with drawings and a loading plan. Most enquiries are answered within one working day.