What documents should travel with a loaded container house?
A packing list matching the invoice, loading photographs including the seal number, test reports, the bill of lading and the VGM declaration.
A packing list matching the invoice, loading photographs including the seal number, test reports, the bill of lading and the VGM declaration.
A 40ft flat pack module that ships knocked down and gives a 29 m² open floor plate — the standard choice for canteens, recreation rooms and open-plan site offices.
Stacked flat pack modules with an external steel staircase and walkway — the highest bed count per square metre of land for labour camps and worker accommodation.
A panoramic capsule with two sleeping rooms, a living area and a full bathroom — the family or twin-key version of the capsule range.
Photographs and video are JIUJIAN GLOBAL factory material. Third-party photographs used elsewhere on this site are credited with author, licence and source on the image credits page. Values marked "to be confirmed" depend on destination climate, local code or final layout and are fixed on the production drawing before deposit.
Modular dormitories, ablution blocks, mess halls and site offices for mine sites that start small and expand as the ore body is proven.
See the project setup →Short-term and relocatable accommodation for events, seasonal workforces, relief operations and projects that need rooms within weeks.
See the project setup →Send your layout and destination port. We reply with price, specification sheet and container loading plan within one working day.